Dear residents!
Regarding the resumption of gas supply to our house on 15.11.2021:
On the first front door:
1) Inspection (positive acts were made) of smoke and ventilation ducts and connected to the gas supply at the risers of 3-room apartments (apartments 3, 10, 17, ..., 94) and 2-room apartments (6, 13, 20, ..., 97).
2) 4 risers remained unconnected, as there is no information about acts in 7 apartments: 18, 19, 49, 51, 74, 77, 89.
3) On November 16, 2021, it is planned to connect the riser of 4-room apartments to the gas supply.
On the second front door:
1) Inspection (positive acts) of smoke and ventilation ducts was carried out and 5 out of 7 risers were connected to gas supply.
2) On November 15, 2021, the canals were cleaned in 2 apartments (4-room and 2-room apartments).
3) On November 16, 2021 it is planned to connect (after the measures taken, see item 2 above) to the gas supply risers of 4-room and 2-room apartments.
Thanks for understanding.