Dear residents, Executive Director of AJOAH "Florencii 5" Skydan Oleksandr Fedorovych (050 444 25 31) reports:
1. Information for the maintenance report from FOP "Balanchuk O.A." for August 2020.
2. On August 19, work was carried out in the ITP to clean the DHW heat exchanger by a chemical method. The work was carried out by FOP Balanchuk.
3. A new heat meter is prepared for separate heating metering. Installation will be carried out at the heating unit in September 2020. Executor of works is Sempal LLC.